Bibliotecas PUCV

Resolución del problema Job Shop Scheduling utilizando heurísticas constructivas

Repositorio Dspace/Manakin

Buscar en DSpace


Búsqueda avanzada

Mostrar el registro sencillo del ítem

dc.contributor Cubillos Figueroa, Claudio Alonso
dc.creator Mellado Silva, Rafael Alejandro
Fecha Ingreso dc.date.accessioned 2021-10-19T23:59:03Z
Fecha Disponible dc.date.available 2021-10-19T23:59:03Z
Fecha en Repositorio dc.date.issued 2021-10-19
Resumen dc.description <p>The repair of the assets in a company, for example machinery or other, requires a number of essential resources to be developed, highlighting the human, technical and physical resources. It should be noted that planning is required to organize multiple tasks to repair the various equipment.</p><p>Considering this, in this document, is shown the formulation of the production chain structured, sequencing tasks of medical equipment repair, called Flow-Shop. That is, all the elements are shown, and then a proposal is offered for the application of this problem, in a real case study.</p><p>Thus, as a result of studies, the formulation of cases corresponding application in a unit of medical equipment, which is in charge of the public sector in our country will be displayed</p>
Resumen dc.description last modification
Resumen dc.description Ingeniero de Ejecución en Informática
Resumen dc.description INGENIERIA DE EJECUCION INFORMATICA
Resumen dc.description <p>The repair of the assets in a company, for example machinery or other, requires a number of essential resources to be developed, highlighting the human, technical and physical resources. It should be noted that planning is required to organize multiple tasks to repair the various equipment.</p><p>Considering this, in this document, is shown the formulation of the production chain structured, sequencing tasks of medical equipment repair, called Flow-Shop. That is, all the elements are shown, and then a proposal is offered for the application of this problem, in a real case study.</p><p>Thus, as a result of studies, the formulation of cases corresponding application in a unit of medical equipment, which is in charge of the public sector in our country will be displayed</p>
Lenguaje dc.language spa
dc.rights sin documento
Materia dc.subject Planificación de la producción
Materia dc.subject ADMINISTRACION DE MATERIALES
Materia dc.subject SISTEMAS DE PRODUCCION
Materia dc.subject CALIDAD TOTAL
Title dc.title Resolución del problema Job Shop Scheduling utilizando heurísticas constructivas
Tipo dc.type texto


Archivos en el ítem

Archivos Tamaño Formato Ver

No hay archivos asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem